Sharp CD-M4000 Guida Utente Pagina 123

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 122
M4000 Insulation Analyzer User Guide
72A-1230 Rev. F 4-33
July 22, 2005
Figure 4.13 Field Recalibration Instructions
The Field Adapter cable is an accessory cable which connects from the High
Voltage Test Cable to the black connectors on the Field Calibration Reference.
There is a test abort criterion described in the first test of each setup. The test
abort allows the operator to correct a setup error and then restart from the point
where the error was first detected, without losing successfully completed test
information.
At the conclusion of the Field Recalibration, a summary table like that shown
in Figure 4.14 will be displayed.
Figure 4.14 Field Calibration Results
Vedere la pagina 122
1 2 ... 118 119 120 121 122 123 124 125 126 127 128 ... 203 204

Commenti su questo manuale

Nessun commento